Measures to Reinstate Plant, Equipment and LPS

This Loss Prevention Standard contains guidance on how to reduce risks when you are planning to reinstate process plant and equipment that have been shut down or mothballed on a temporary basis, for example in response to a business downturn or forced closure due to external factors such as an epidemic/pandemic event

This document is part of a series of Aviva Loss Prevention Standards aimed at the reinstatement of premises, plant and operations and should be read in conjunction with the other standards in the series which include:

• Measures to Reinstate Buildings, Premises and the Working Environment

• Measures to Manage People and Operations following Reinstatement after a Shutdown

 

Download

Have any questions? please don't hesitate to contact one of our team

David.baker@ascendbrokingold.co.uk  |  Office: 01245 449060  |  Mobile: 07849 351919

Recent Posts

Quick insurance proccess

Talk to an expert